Technology
Reconditioned fire-tube boiler, with EP’s advanced boiler control system with online monitoring
8 T/hr 10 Bar Coal-fired boiler
Location
Wadeville, Gauteng
Commissioning Date
2014
Investment Option
Outsourced Steam
“Significant savings have been realised without large preceding capital expenditure. In addition, the new boiler operations have not been a distraction of plant management, allowing everyone to focus on their core functions.” Project Manager